Project Detail

This 500mm hdpe pipe project is to replace previous leakage local hdpe pipe manufacture product. This project is belong to PDAM Tirtanadi at Komplek Cemara, Medan. Our pipe installation services come with a perfect results. It doesn’t need long time for our team to finish the problem. We get extra pipe installation job after this.

Our standard quality construction

We don’t want to do useless job to replace a fragile HDPE pipe with the same quality things. So, we replace and do some new installation to make everything faster and cost saving. We use our HDPE repair saddle to fix some of the leakage. Our principle is to make sure every of our work done perfectly in every area. We are providing perfect pipe, worry-free installation services with satisfactory results. All of our joint is under ISO standard and so do the pipe product come with ISO and SNI standard.

  • Premium material PE-100 applied to the HDPE pipe
  • Special joint applied to the HDPE pipe
  • Each pipe come with stubflange joint on both end of pipe

Client : subcon CV. Mitra Sejati Abadi

Location : Medan, Sumatera Utara

Area :

Finished On : September 17, 2016

Value : $$$

Remarks : The project was completed under the budget, with the savings returned to the owner.

Description

We visit the site while the producing is on going. Here we need to do some digging work to take out the leakage HDPE pipe. As time goes by, as the pipe produced, we send directly to the site and start to do the replacement. We need to connect the 500mm with stubflange joint type on each end of the pipe to save the installation time since the project need to be done very fast. The site is inside Komplek Cemara residential place. This pipe is belong to PDAM Tirtanadi and it is one part of the main pipeline.

 

The Challenges

Everything need to be replaced fast since this is part of main pipeline in Medan City and the site is inside the Komplek Cemara Residential area. We are not allowed for any mistake or half of the city will got no clean water at a moment till the pipe is replaced. There are so many leakage happened on the previous pipe.

 

Project Goals

Replacing the leakage hdpe pipe buried in 2 meter depth. We have to do all the digging process and then replace it with the new one from us.

belawan site

Belawan, Medan

admin

Project Detail

Installing HDPE Pipe (pipe hdpe) and its fitting with standard butt fusion welding system. HDPE pipe welder with certificate required. The goal of the hdpe pipe installation project is to flow the sea water to the special filtration to produce fresh water for the chemical factory and the resident use. Project deadline is 2 (two) months. Pipe installed on the tower which mean over 12 meters above the ground.

Quality Management system: ISO 9001:2015
Product standard: HDPE pipe SNI 4829.2:2015
Material standard: HDPE #1 Premium material applied
Note:
International hdpe welder certificate technician

  • Premium material PE-100 applied to the HDPE pipe
  • Three months retention applied
  • Special joint applied to the HDPE pipe
  • Each pipe come with customized length @12 meter length pipe

Client : PT. Musim Mas

Location : Belawan, Medan

Area : –

Finished On : September 12, 2015

Value : $$$

Remarks : The project was completed under the budget, with the savings returned to the owner.

Description

New pipeline installation by DENYA pipe installation team. HDPE pipe installation time is 2 (two) months with 3 (three) months retention. Pipe diameter is various start from 110 mm up to 200 mm.

The Challenges

A short deadline terms applied to this project with limited electricity to install the pipeline.
Installation site is floating on the chemical factory means over the ground around more or less 12 meters height. Very risky, pipe supply and transporation is limited.

Project Goals

To flow the sea water to the filtration area. Filtration technology is adopted from Singaporean to turn sea water into fresh water which can be drink directly before supply ready to drink water to chemical factory and the employee residence.
To finish the pipe installation project on time

The Chalenges

The standard chunk of Lorem Ipsum used since the 1500s is reproduced below for those interested. Sections 1.10.32 and 1.10.33 from “de Finibus Bonorum et Malorum” by Cicero are also reproduced in their exact original form, accompanied by English versions from the 1914 translation by H. Rackham.Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock, a Latin professor at Hampden-Sydney College in Virginia.

Project Goals

The standard chunk of Lorem Ipsum used since the 1500s is reproduced below for those interested. Sections 1.10.32 and 1.10.33 from “de Finibus Bonorum et Malorum” by Cicero are also reproduced in their exact original form, accompanied by English versions from the 1914 translation by H. Rackham.Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock, a Latin professor at Hampden-Sydney College in Virginia,