Kawasan Industri Dumai

admin

Project Detail

Installing new pipeline with various diameter for the new palm oil manufacturing. Pipeline use to supply fresh water from the river to the factory and the employee houses. The project finished with satisfactory results.

Our Product Quality Standard

Quality Management system: ISO 9001:2015
Product standard: HDPE pipe SNI 4829.2:2015
Material standard: HDPE #1 Premium material applied
Note:
International hdpe welder certificate technician

  • Premium material PE-100 applied to the HDPE pipe
  • Three months retention applied
  • Special joint applied to the HDPE pipe
  • Each pipe come with customized length @12 meter length pipes

Client : PT. Tirta Kimia

Location : Pelintung, Kawasan Industri Dumai

Area : –

Finished On : April 23, 2017

Value : $$$

Remarks : The project was completed under the budget, with the savings returned to the owner.

Description

New pipeline installation using our pipe installation services. Installation time is less than 2 (two) weeks with 3 (three) months retention. Pipe diameter is various start from 110 mm up to 200 mm.

The Challenges

A short deadline terms applied to this project with limited electricity to install the pipeline.

Project Goals

To flow the fresh water from nearest water springs to the palm factory and the employee residence.
To finish the pipe installation project on time.